Post navigation

Prev: (04/29/09) | Next: (04/29/09)

Remington Court Project Release Party by HyBrid Architecture on Friday, May 1st

The Project Release Party for HyBrid Architecture + Assembly’s newest project, Remington Court, is on Friday, May 1st.

 

This 4-unit urban infill housing project was developed, designed, and built by the team of HyBrid Architecture and HyBrid Assembly.  HyBrid principal Robert Humble describes the project: “The best way to execute our vision and values was through developing this project ourselves.  Access to light, air, and views was a primary force in shaping this building.”

 

The party will begin after work on Friday, with local artists (Jamie Potter, Tim Brown, and others) exhibiting their work and live music throughout the evening.  Food and drinks will be provided as well, so stop by at any time that works with you, or stay for the entire event.  Come have fun with the HyBrid team, explore our newest building, and we look forward to seeing you at the party this Friday!

 

Sincerely,

 

HyBrid Architecture + Assembly

www.hybridseattle.com

206.267.2677

 

Date: Friday, May 1st, 2009     5pm – midnight

Location: 1320 East Remington Court

S Capitol Hill District: 1 block S of 14th and Jefferson

Subscribe and support CHS Contributors -- $1/$5/$10 per month

Comments are closed.